What we’re fixing — and why it matters now.

The Branch is running two campuses on end-of-life hardware, legacy AV routing, and expiring security licenses. The roadmap below resolves every issue listed here before it becomes a Sunday morning problem.

Basic Advanced

Switch to Basic for a plain-language summary.

⚠ Critical — Deadline August 17th
Farmers Branch: FortiGate 100E End-of-Life
  • FortiGate 100E reaches end-of-life August 17th — no security patches, no support after that date.
  • Continuing on expired hardware exposes both campuses to unpatched vulnerabilities with no vendor recourse.
  • APs must be swapped before EOL or FortiGate licensing must be renewed — unnecessary cost on dying hardware.
  • Phase 1 replaces the firewall and re-architects the network before this deadline hits.
→ Fixed in Phase 1, Q3/Q4 2026
⚠ Urgent — Deadline October 14th
Vista Ridge: FortiGate 90G Subscriptions Expiring
  • Annual FortiGate subscriptions expire October 14th — UTM, web filtering, and geo-blocking all go dark.
  • Without renewal, the US-only IP policy and category-based blocking lapses immediately.
  • Renewing locks budget into hardware being replaced in Phase 1 anyway.
  • Phase 1 transitions both sites to a modern firewall before the October deadline.
→ Fixed in Phase 1, Q3/Q4 2026
Network Issue — Both Campuses
Double NAT from AV Production Equipment
  • Production equipment on separate routers creates double NAT at both locations.
  • Double NAT breaks device discovery and causes unpredictable latency during live production.
  • Nighthawk routers in traveling cases are a recurring failure point — they drop connections.
  • Phases 2 and 3 replace AV switches and unify production under a single managed topology.
→ Fixed in Phase 2 & 3
Infrastructure — Mixed Hardware
Legacy Switch Mix & Unmanaged AV Segments
  • Mix of Dell PowerConnects and Fortinet switches — no unified management plane.
  • AV hubs use consumer-grade Netgear 8-port switches with no VLAN support or monitoring.
  • 5 Nighthawk routers acting as APs in AV cases are unmanaged and invisible to monitoring.
  • Vista Ridge HVAC on Honeywell IoT APs needs VLAN isolation to prevent lateral movement.
→ Fixed in Phase 2, 3 & 4
Current Equipment Inventory
What’s being replaced, upgraded, or unified
Why It’s Being Replaced
End-of-life hardware, unmanaged segments, and double NAT are active risks
Farmers Branch
Non-AV Network
Access Points6EOL Aug 17
Switches (48-port)2Mixed mgmt
Switches (24-port)2Mixed mgmt
FortiGate Firewall1EOL Aug 17
AV Network
8-port Netgear switches6Unmanaged
24-port switch (booth)1Review
16-port switches3Review
Nighthawk Router/APs3Double NAT
Vista Ridge
Non-AV Network
Access Points14Oct 14 expiry
Switch (48-port)1Mixed mgmt
Switch (24-port)1Mixed mgmt
Switches (16-port)4Review
FortiGate Router1Oct 14 expiry
AV Network
24-port switches2Review
8-port switches6Unmanaged
16-port switches3Review
Nighthawk Router/APs5Double NAT
Case Study — The Branch
IT Infrastructure Roadmap
A 4-phase modernization across Vista Ridge & Farmers Branch campuses, 2026–2028. Click a phase to explore scope and rationale.
$290k–$325k
Total estimated investment
18 months
Phased delivery timeline
2 campuses
Vista Ridge & Farmers Branch
$290k–$325k
Total estimated investment
18 months
Phased delivery timeline
2 campuses
Vista Ridge & Farmers Branch
Project Timeline
18 months, 4 phases — every milestone mapped from day one.
Q3/Q4 2026
Phase 1
Foundation
$45k–$50k
  • EdgeRouter & subnet redesign
  • FortiGate EOL resolved
  • UPS power redundancy
  • VPN deployed
  • 20 APs replaced
Network baseline established
Q1/Q2 2027
Phase 2
Farmers Branch
$110k–$125k
  • AV switches — fix double NAT
  • 12 APs total
  • 40 cameras → ethernet IP
  • 10 access control doors
Farmers Branch modernised
Q3/Q4 2027
Phase 3
Vista Ridge
$75k–$80k
  • AV switches — remove Nighthawks
  • AVL network deployed
  • 40 cameras → ethernet IP
  • Access control unified
Vista Ridge modernised
Q1/Q2 2028
Phase 4
High-Speed Fiber
$60k–$70k
  • 10G fiber to all IDFs
  • 4 runs at Vista Ridge
  • 4 runs at Farmers Branch
Infrastructure complete
Complete Mid 2028
Vista Ridge · Live Model

Facility & Fiber Backbone

Interactive 3D model of the Vista Ridge campus — the MDF, four IDFs, the single-mode fiber backbone that lands in Phase 4, and Wi-Fi access-point coverage across both levels. Drag to orbit · scroll to zoom · right-drag to pan.

MDFIDF A–DFiber 12/24-strandWi-Fi AP
Additional Scope

Outstanding Proposals

The following proposals have been scoped and quoted independently from the 4-phase roadmap.

Quoted Separately
The Branch — Fellowship Hall
Project Total: $24,168
Value / Engineering Total: $8,918
—
Days until expiryLoading...
View Proposal ↗
Quoted Separately
The Branch — LED Cross
Project Total: $19,309
 
—
Days until expiryLoading...
View Proposal ↗
Open Tickets
5 active
Tyson Wright, CCO
Your Account Manager
Tyson Wright
Request a New Project
CCO

Tyson oversees client relationships and is your direct point of contact for this engagement. From initial scoping through every phase of delivery, he’s accountable for making sure this project runs on time, on budget, and on your terms.

Call (979) 218-2546 Tyson@fm.net
Nucleus.net
Network Operational

The Branch is a Nucleus.net client. Network status is publicly verifiable at any time.

Check at isnucleusdown.com ↗
Network Speed Test
Run a live speed test on your connection from this device.
Run Speed Test ↗
thephased.net

© 2026 All rights reserved.

(800) 560-2485support@thephased.net
0